Applications & Permits

Instructions for Land Use Applications:

  1. Complete Land Use Application in it’s entirety (or this will be returned to you).
  2. Include a detailed site plan showing the lot with dimensions, proposed construction, setbacks and any natural features on the site.
  3. Make 3 copies of the Land Use Application and detailed site plan.
  4. See Fee Schedule and make check payable to the Township of Arcadia and mail (Priority best) or deliver all 3 copies including payment to:

Josh Mills
4538 Benzie Hwy
Benzonia, MI 49616

Land Use Application

Parcel Division Application

Fee Schedule

Zoning Administrator/Site Inspector: Josh Mills 231.651.9117